It shall not be a function of the Nashville Department of Transportation and Multimodal Infrastructure to clear sidewalks, as this is the responsibility of the adjoining property owners per Metro Charter 13.32.040.
Priority routes may be terminated, temporarily interrupted, or postponed due to unpredictable or peculiar weather conditions, emergency situations, safety, and/or shortages of materials, equipment, or funds.
Snowfall accumulations of up to two inches are usually handled (depending on weather conditions) by salting, or combinations of salt and calcium chloride.
Snowplowing operations generally do not begin unless snowfall accumulations measure more than two inches, and/or weather forecasts call for additional accumulations.
During snowplowing operations any vehicles abandoned within the public right-of-way in such a manner to obstruct operations and/or create a hazard will be removed at the expense of the owner.
Plow operators are instructed to plow streets as close as possible to the curb line with a minimum number of passes. Where sidewalks are close to the curb, drivers are instructed to avoid pushing snow onto the sidewalks.
Records will be maintained by the department to document its level of service.