The Codes Administration is working to ensure that all residents affected by the storm can access necessary information as the rebuilding process begins. All permit applications for new construction, demolition, or rehabilitation related to storm damage will be expedited. All work requiring permits will still be subject to associated building and trades standards and inspections.
Emergency Electrical Reconnect Plan
Any structures with damage sustained in the December 9, 2023 tornado in Davidson County shall require a letter from a licensed structural engineer before a reconnect will be authorized.
A release number submitted to Nashville Electric Service to establish reconnection must be accompanied by photos of all sides of the structure, meter base, riser, and point of attachment. If new wiring is installed, a photo of the electrical breaker panel will also be required.
For questions and additional information, contact the Metro Codes Department Electrical Inspection Division at 615-862-6575.
Permit Fee Waiver for Tornado Damaged Property
Pursuant to resolution adopted by the Metropolitan Council of Davidson County, building permit fees will be waived for any building permit obtained on or before June 30, 2024, for properties affected by the December 9, 2023, tornado. Before building permit fees can be waived, the applicant must execute an affidavit declaring that the property was damaged by the tornado and that the permit fees are not eligible for reimbursement.