The proposed changes to the Stormwater Management Manual are now available for public comment. Please see the Notice of Proposed Change for highlights of the revision, known impacts of the changes, and the date the public comment period will end.
- Volume 1 – Regulations:
- Volume 2 – Procedures:
- Volume 3 – Theory: no changes
- Volume 4 – Best Management Practices, Section 3 Temporary Construction Site Management Practices (TCP):
- Volume 5 – Low Impact Development Manual
Please submit written comments to:
Rebecca Dohn, Metro Water Services, 1607 County Hospital Road Bldg. A, Nashville, TN 37218 or [email protected]