Process
The following steps are the process, in order, for Stormwater Review.
- Plan Submittal (see below)
- Plan Review and Approval
- Pre-Construction Meeting
- Erosion Prevention and Sediment Control (EPSC) Installation
- Initial EPSC Inspection
- Grading Permit Issuance
- Routine EPSC and MS4 Inspections
- As-Built Submittal
- Final Inspection and Approval
Plan Submittal Requirements
Plans submittals must include:
- Development Services Transmittal Form
- Plans Submittal Form
- Plans electronically submitted
- Project Narrative describing the proposed project and how it functions
- Calculations including stormwater infrastructure, water quantity, water quality, and LID waiver if applicable
- Drainage maps