2021 Stormwater Management Manual
- Regulations - Volume 1
- Procedures - Volume 2
- Theory - Volume 3
- Best Management Practices (BMP) Manual - Volume 4
- Low Impact Development (LID) Manual - Volume 5
If a project has sufficient site limitations that preclude it from meeting the Low Impact Development requirement, they will need to submit a Low Impact Development Waiver Application electronically to [email protected] (for sites located in the CSS) and Metro Water Services Stormwater Waiver (for sites located in the MS4)
You may be eligible for a reduction in your Stormwater User Fee! Please see the Stormwater User Fee Credit Manual for more information.
Additional submittal information and email addresses can be found at Metro Water Services Development Services: Water, Sewer and Stormwater Information